Every Creations are unique and it takes around 5 days from molding to finish
step 1: Molding the orbs with White Portland Concrete and different selections of Black Lava Rocks
step 2: Time to cure: 96 hours (2x48 hours for the lower and upper part of the Orbs)
step 3: Unmolding, washing and cleaning the structure, Let it dry
step 4: Grinding, Sanding and Polishing
step 5: Making it Green by additions of Silk and Preserve Plants, this step can take 4 hours
step 6: Giving a last nice refreshing Touch before Photoshoot
Our Creations are built with good quality material, they are strong and heavy, ask for assistance if
needed to move it.
Always move the piece gently with your 2 hands from the bottom, never hang it from the top part.
The bottom of the structures include a large Felt Pad to protect your furnitures.
Make sure your hands are cleans and dry before touching it.
The silk plants are UV resistant but avoid to locate it in a sunny locations or next to a window.
If you have to dust it gently use a soft brush.
Like every houseplants make sure your live plant doesn’t soak in water to prevent rotted roots and diseases.
We propose maintenance like changing your plants, refreshing, dusting, and cleaning your piece. (Broward County only)
Contact us for estimation.

