Each Creation is unique and takes approximately 5 days from molding to final finish
Creation Process:
step 1: Molding the orbs using White Portland Concrete and a curated selection of Black Lava Rocks.
step 2: Curing time : 96 hours (2x48 hours for the lower and upper parts of the Orb).
step 3: Unmolding, washing and cleaning the structure, then allowing to dry completely.
step 4: Grinding, Sanding and Polishing.
step 5: Adding greenery using Silk and Preserve Plants, this step can take 5 hours.
step 6: Final detailing and refreshing touches before Photoshoot.
Our Creations are made with high-quality materials, they are strong and heavy, ask for assistance if
needed when moving them!
Always move the piece gently using both clean hands from the bottom.
Never lift or hang the piece from the top.
The base includes a large Felt Pad to protect your furniture.
Ensure your hands are clean and dry before handling.
The Silk plants are UV-resistant but avoid placing the piece in direct sunlight.
To dust, gently use a soft brush.
As with all houseplants, ensure any Live Plant are not overwatered to prevent root rot or disease.
Maintenance Services
We offer maintenance services including Plant replacement, refreshing, dusting, and cleaning your piece. (Broward County only)
Contact us for an estimate.

